参考文献(References):
[1] ZHOU C C,ZHANG L K,KANG L J.Modeling timetable coordination in urban mass transit networks[J].Advanced Materials Research,2014,1030/1031/1032:2207.
[2] 杨艳.地铁线网末班列车时刻表协同编制优化[J].山东交通学院学报,2020,28(4):46.
[3] 康柳江.城市轨道交通末班列车运行计划协同组织优化[D].北京:北京交通大学,2016.
[4] GUO X,WU J J,SUN H J,et al.Timetable coordination of first trains in urban railway network:a case study of Beijing[J].Applied Mathematical Modelling,2016,40(17/18):8048.
[5] CORMAN F,D’ARIANO A,PACCIARELLI D,et al.Dispat-ching and coordination in multi-area railway traffic management [J].Computers & Operations Research,2014,44:146.
[6] KECMAN P,CORMAN F,D’ARIANO A,et al.Rescheduling models for railway traffic management in large-scale networks[J].Public Transportation,2013,5(1/2):95.
[7] SAM? M,PELLEGRINI P,D’ARIANO A,et al.Ant colony optimization for the real-time train routing selection problem[J].Transportation Research Part B:Methodological,2016,85:89.
[8] DU P,LIU C,LIU Z L.Walking time modeling on transfer pedestrians in subway passages[J].Journal of Transportation Systems Engineering and Information Technology,2009,9(4):103.
[9] 郭欣.城市轨道交通线网列车时刻表分阶段协同优化[D].北京:北京交通大学,2018.
[10] KANG L J,MENG Q.Two-phase decomposition method for the last train departure time choice in subway networks[J].Transportation Research Part B:Methodological,2017,104:568.
[11] LIU Y,FENG X S,DING C C,et al.Electric transit network design by an improved artificial fish swarm algorithm[J].Journal of Transportation Engineering,Part A:Systems,2020,146(8):04020071.
[12] LIU Y,FENG X S,ZHANG L K,et al.A pareto artificial fish swarm algorithm for solving a multi-objective electric transit network design problem[J].Transportmetrica A:Transport Science,2020,16(3):1648.